265 Franklin Street Lobby
Boston, MA
Type of project: Renovation
Duration of Project: 8 months
Partners: Jung|Brannen Associates, Inc.
Noteworthy: Shawmut mobilized a 20-ton, truck-mounted crane inside the building’s lobby, allowing the team to erect the steel from the top down, thereby maximizing use of the available space while minimizing risk to pedestrians and businesses.